Pre-requisites
NOTE: For detailed installation instructions, see Site preparations and VEP4600 installation.
The following is a list of components required for successful platform installation:
• VEP4600 platform
• AC country- and regional-specic cables to connect the AC power source to each of the platforms’ AC power supplies
• Two-post rail kit mounting brackets for rack installation, included
• Screws for rack installation
• #1 and #2 Phillips screwdrivers, not included
• M2 Philips drive at head screwdriver, not included
• Ground cable screws (included) for L-bracket—order separately
• M3 ground lug assembly kit screw, depending on your platform
• Copper/ber cables
Other optional components are:
• UL-certied ground lug assembly kit with bracket
• Extra mounting brackets for the 4-post mount
• Extra power supply unit
• Extra fan module
VEP4600 congurations
You can order the VEP4600 in the following conguration:
• VEP4600 AC normal airow: two 10GbE SFP+ and four 1000 Base-T ports, one or two AC power supplies, and four or ve AC normal
fan subsystems with airow from the I/O side to the power supply side, depending on the conguration.
– Sixteen-core systems use ve fans and two PSUs.
– Eight-core systems use four fans and one PSU.
– Four-core systems use four fans and one PSU.
Luggage tag
The VEP4600 has a pull-out tag, known as a luggage tag, on the I/O-side of the platform. The front of the luggage tag includes platform ID
information.
VEP4600 platform
11