EasyManua.ls Logo

Dell 5200 - Page 48

Dell 5200
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 76. Install screws and nuts on side panel
Figure 77. Install screws and nuts on bottom panel
NOTE: M3 x 4L screws and M3 nuts are included in the Expansion Module contents.
7. Remove the screws and standoffs of the front I/O panel, as shown in the following figure. Remove the four-port COM cable
from the front I/O panel.
48
Installation procedure for 2x GbE with PoE uFM module

Related product manuals