Installation and Setup Index
Index-3
PS5500 array
bezel installation
2-23
bezel removal 2-22
cable management system 2-17,
2-22
connecting network cables 2-20
connecting power cables 2-16
connecting the serial cable 2-23
control module restriction 2-14
environmental requirements 2-13
hardware requirements 2-14
increasing bandwidth 2-2
initializing 3-2
multipath I/O recommendation 2-2
network address 3-2
network configurations 2-20
network recommendations 2-2
network requirements 2-2, 2-20
power configurations 2-16
power requirements 2-13
powering on 2-22
protecting from discharge 2-1
rack mount requirement 2-15
RAID policy 3-7
RAID support 3-8
shipping box contents 2-14
steps for installing 2-16
subnet access recommendation 2-2
technical specifications 2-13
R
rack mount requirement
PS5000 array
2-7
PS5500 array 2-15
RAID levels, supported 3-7
RAID policy
description
3-7
setting with CLI 3-7
setting with GUI 3-8
Remote Setup Wizard
configuring the software
3-6
description 3-1
requirements 3-1
S
setup utility
configuring the software
3-4
description 3-2
requirements 3-2
snapshots, reserving space 4-2
SNMP, configuring 5-1
software configuration, methods 3-2
Spanning-Tree recommendation 2-3
spares, set as part of RAID policy 3-7
standby mode, defined 2-20
storage pools, defined 1-2
switches
bandwidth requirement
2-10, 2-21
Flow Control recommendation 2-3
Jumbo Frames recommendation
2-3
link recommendation 2-10, 2-21
Spanning-Tree recommendation
2-3
unicast storm control
recommendation
2-3
VLAN recommendation 2-3
T
target (iSCSI)
connecting to
4-6
defined 1-1
obtaining name 4-6
thin provisioning, enabling on a
volume
4-2
time, setting 5-1
U
unicast storm control recommendation
2-3