EasyManua.ls Logo

Dell Force10 S4820T System

Dell Force10 S4820T System
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 Installation
Four-post Threaded Configuration:
1
For this configuration, you must remove the flange ear castings from each
end of the ReadyRails assemblies. Use a Torx driver to remove the two
screws from each flange ear and remove each casting. Refer to Figure 1-8,
item 1. Retain the castings for future rack requirements.
2
For each rail, attach the front and rear flanges to the post flanges with two
user-supplied screws at each end. Refer to Figure 1-8, item 2.
Figure 1-8. Four-post Threaded Configuration

Related product manuals