14 Tower-to-Rack and Rack-to-Tower Conversion Guide
www.dell.com | support.dell.com
Figure 1-6. Removing/Installing the Control Panel Assembly and Front Panel
3
Using a T-10 Torx driver, remove the 22 screws that secure the tower front panel to the drive
tray. See Figure 1-6.
Installing the Rack Front Panel and Control Panel Assembly
1
Install the rack front panel
a
Orient the system as shown in Figure 1-6.
b
Using a T-10 Torx driver, install the 22 screws (that came in your kit) that secure the rack
front panel to the drive tray.
NOTE: The control panel assembly’s LCD board and the I/O board are the same for both the tower and
rack systems. Only the carrier is different. When converting your tower system to a rack system, you must
remove the LCD board and the I/O board from the control panel assembly that you removed in step 2 of
"Removing the Control Panel Assembly and Tower Front Panel."
drive tray in
maintenance
position
control panel
assembly
control panel
cable clamp
screws (3)
T-10 Torx
screws (22)
front panel
Y1001bk0.book Page 14 Thursday, July 8, 2004 4:32 PM