EasyManua.ls Logo

Dell PowerEdge 2800 - Installing the Rack Doors; Installing the Rack-To-Tower Kit; Rack-To-Tower Kit Contents

Dell PowerEdge 2800
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 Tower-to-Rack and Rack-to-Tower Conversion Guide
www.dell.com | support.dell.com
Figure 1-9. Installing the Rack Bezel
Installing the Rack Doors
See the documentation provided with the rack for instructions on installing rack doors.
Installing the Rack-to-Tower Kit
CAUTION: The system may weigh up to 45.36 kilograms (100 pounds) when fully loaded. To prevent
personal injury, do not attempt to move the system by yourself.
Rack-to-Tower Kit Contents
The rack-to-tower kit includes the following items (see Figure 1-10):
One tower bezel complete with keylock and keys
One tower front panel
bezel
keylock
release latch
Y1001bk0.book Page 18 Thursday, July 8, 2004 4:32 PM

Other manuals for Dell PowerEdge 2800

Related product manuals