Dell PowerVault ML6000 Getting Started Guide 19
Powering On the Library
1
Turn on each power supply’s power switch. 
2
Turn on the library’s main power using the power button located on the front 
of the 5U Library Control Module. 
The Setup Wizard screen appears on the operator panel when the library has 
completed its power-on self-test (POST) and initialization. This process takes 
approximately 30 minutes. Do not power off the library during this process.
1 Module terminator 2 Ethernet cable connected to Gigabit 
Ethernet port
3 Module-to-module cable 4 Power cords
DAO.book  Page 19  Wednesday, September 9, 2015  11:31 AM