Figure 12. Eye Bolts Lifting
5.
Once the PCS is placed in its final installation site, secure the PCS to the site as described
in “Securing a Cabinet in a Final Location” on page 28.
6.
Remove the hoist.
7.
Once the cabinet is secured to the location, install the top cover, see “Securing a Cabinet in a
Final Location” on page 28.