EasyManua.ls Logo

Deutz TCD 2013 2V - Page 43

Deutz TCD 2013 2V
471 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
© 02/2010 OBJ_DOKU-21742-001.fm
4/12
Job card overview
TCD 2013 2VSorted alphabetically
Removing and installing the coolant pump (V-belt
drive)
W 37-03-01 Coolant pump
Removing and installing the crankcase bleeding W 01-01-01 Crankcase
Removing and installing the crankshaft W 05-05-01 Crankshaft
Removing and installing the cylinder head cover W 08-01-01 Cylinder head
Removing and installing the cylinder liner W 04-01-01 Cylinder liner
Removing and installing the engine mounting
(elastic mounting)
W 47-01-01 Engine mounting
Removing and installing the exhaust line W 41-01-01 Exhaust pipe
Removing and installing the exhaust return module W 08-02-01 Cylinder head
Removing and installing the fan console (V-rib belt
drive)
W 39-04-03 Fan console
Removing and installing the fan drive W 39-02-01 Fan drive
Removing and installing the flywheel W 05-03-01 Flywheel
Removing and installing the front cover (opposite
side to flywheel)
W 01-03-01 Front cover
Removing and installing the fuel filter console W 20-01-01 Fuel filter
Removing and installing the fuel pressure sensor W 48-06-01 Electrical equipment
Removing and installing the fuel supply pump (V-
belt drive)
W 20-02-01 Fuel pump
Removing and installing the gearcase cover W 09-02-02 Gearcase
Removing and installing the generator (V-belt drive) W 44-02-01 Generator
Removing and installing the glow plugs W 63-02-01 Start aid
Removing and installing the high-pressure pump
(Installation position A)
W 17-01-04 High-pressure pump
Removing and installing the high-pressure pump
(Installation position B)
W 17-01-05 High-pressure pump
Removing and installing the impulse transmitter
(camshaft)
W 48-02-03 Electrical equipment
Removing and installing the impulse transmitter
(crankshaft)
W 48-02-01 Electrical equipment
Removing and installing the injector W 19-01-01 Injector
Removing and installing the lubricating oil c
ooler W 1
5-02-01 Lubricating oil cooler
Removing and installing the lubricating oil cooler
housing
W 15-02-02 Lubricating oil cooler
Removing and installing the lubricating oil pan
(metal sheet lubricating oil pan)
W 02-01-01 Lubricating oil sump
Removing and installing the oil pressure switch W 48-04-01 Electrical equipment
Removing and installing the oil suction pipe W 16-01-01 Oil suction pipe
Removing and installing the piston and con rod W 06-01-01 Connecting rod
Activity Job card Maintenance group