XT855 Operator’s Manual Dig - 65
Digging
CMW
Digging
Single Inline Trench
1. Position unit with tracks parallel with the intended
digging path.
2. Fill and dump buckets.
3. Reposition unit as needed to continue trench.
4. When trench is finished, stow excavator, pivot seat
to face tool carrier end, switch unit into tool carrier
mode and drive away from trench.
Single Offset Trench
1. Position unit near the intended digging path.
2. Swing excavator and offset boom as needed to
align with digging path.
3. Fill and dump buckets.
4. Reposition unit as needed to continue trench.
5. When trench is finished, stow excavator, pivot seat
to face tool carrier end, switch unit into tool carrier
mode and drive away from trench.
IMPORTANT: If operator is facing excavator
when driving, unit movements are reversed.
IMPORTANT: If operator is facing excavator
when driving, unit movements are reversed.