Dig - 66 XT855 Operatorās Manual
Digging
CMW
Multiple Trenches
1. Position unit in a central location to the intended
digging paths.
2. Swing excavator and offset boom as needed to
align with first digging path.
3. Fill and dump buckets.
4. Reposition excavator and boom as need to dig
additional trenches.
5. When all trenches are finished, stow excavator,
pivot seat to face tool carrier end, switch unit into
tool carrier mode and drive away from area.