NM2B REPLACEMENT PROCEDURES (continued)
4.26.11 Connect the cables that were previously removed from J7 and J1 on
the power supply assembly.
4.26.12 Place the monitor box top shelf into position, connect its ground wire
to the chassis ground tab, and reinstall the top shelf screws.
4.26.13 Reset the circuit breakers at the back of the monitor box.
4.26.14 Perform the PMS Procedure given in Section 6.