EasyManua.ls Logo

Dräger Narkomed 2B - Page 144

Dräger Narkomed 2B
308 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ADJUSTMENT AND CALIBRATION PROCEDURES (continued) NM2B
5.1.13 Replace the acorn nut on the bottom of the regulator.
5.1.14 Close the cylinder valve and allow pressure to drain from the system.
5.1.15 Close all of the flow control valves and set the System Power switch
to STANDBY.
5.1.16 Disconnect the test gauge from the TEE fitting and replace the plug
in the fitting.
5.1.17 Replace the table top and its retaining screws.
5.1.18 Replace the top drawer in the cabinet.
5.1.19 Connect the pipeline hoses.
5.1.20 Perform the PMS Procedure given in Section 6.
5-2B Rev. U
RETURN TO THIS MANUAL'S TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTS

Table of Contents

Other manuals for Dräger Narkomed 2B

Related product manuals