NM2B ADJUSTMENT AND CALIBRATION PROCEDURES (continued)
5.2.15 Set the System Power switch to STANDBY.
5.2.16 Disconnect the test gauge and replace the plug in the regulator line
TEE fitting.
5.2.17 Replace the table top and its retaining screws.
5.2.18 Replace the rear cover and its retaining screws.
5.2.19 Connect the pipeline hoses.
5.2.20 Perform the PMS Procedure given in Section 6.
5-7
RETURN TO THIS MANUAL'S TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTS