NM2B PMC PROCEDURE (continued)
6.12.16 Open the corresponding cylinder valve and set the System Power switch
to ON.
6.12.17 Set the corresponding flow to 4 l/min.
( ) 6.12.18 On the second test gauge, what is the regulator output pressure? ___
PSI (40 - 49 for N2O), (43 - 49 for Air)
6.12.19 Depressurize the gas circuit.
6.12.20 Remove the test gauge and replace the plug in the TEE fitting.
( ) 6.12.21 Repeat Steps 6.12.13thru6.12.20 for allothergases except CO
2
circuits.
Rev. Y
6-27
RETURN TO THIS MANUAL'S TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTS