Installation, Operation and Parts Manual
EE-6503V2
16
4.4 Items to be checked after installation.
S/N
Check items
YES
NO
1
Screw torque of expansion bolts : no less than 60 -80N•m;
2
Rising speed ≥20mm/s;
3
Noise with rated load 75db;
4
Grounding resistance: not bigger than ;
5
Height difference of the two platform ≤5mm;
6
Mechanical locks are robust and synchronized when running with rated load ;
7
If the control button works as “hold to run”?
8
If limit switches work well?
9
If grounding wire is connected?
10
If rising and lowering smoothly?
11
If there is no abnormal notice during running with rated load?
12
If there is no oil leakage when running with rated load?
13
If there is no air leakage when running with rated load?
14
If expansion bolts, nuts or circlips is well secured?
15
If max lifting height is 1800mm (above ground)?
16
If Safety advices, name plate and logos are clear?