4.1.5 Checking parts
Unfold the package and check if any parts missed as per the following list. Do not hesitate to contact us in case any parts missed, but if you
do not contact us and insist installing upon the lack of some parts, we as well as our dealers will not bear any responsibility for this and will
charge for any parts subsequently demanded by the buyer.
4.2 Installation attentions
4.2.1 Joints of oil hose and wiring must be firmly connected in order to avoid leakage of oil hose and looseness of electrical wires.
4.2.2 All bolts should be firmly screwed up.
4.2.3 Do not place any vehicle on the lift in the case of trial running.
4.3 General Installation Steps
Step 1: Dismantle the package of the lifting platforms.
Remove the carton and packing films wrapped on the platform.
WARNING! : Take off oil hose protectors when cut off the packing strips.
WARNING! : Avoid scratching the painting surface and hoses.
Step 2: Place the lifting platform at expected installation site.
Raise the platform by using a forklift and 2 lifting strings until the mechanical lock is engaged. And then hoist the platform onto the
expected installation site. Dismantle the bolts that fix the platform and its wooden package and move it to the installation site in the same
way as the upper platform.
Attention 1: Before hoisting, make sure the hoses and wires are well protected against damage.
Attention 2: It is necessary to hold the platform during the hoisting process. Irrelevant person is not allowed in installation area.
Step 3: Open the package of the control cabinet and take out accessories in it.
Step 4: Connect hydraulic oil hoses.
Refer to Annex 2. Screw torque for oil hose connector is 60N*M.