MAINTENANCE
Easy and low cost routine maintenance can ensure the lift work normally and safely.
Following are requirements for routine maintenance.
Follow the below routine maintenance schedule with reference to the actual working condition and frequency of your lift.
Lubricated moving parts with NO.1 lithium grease before use.
S/N
Components
Methods
Period
1
Control buttons
Check if control buttons work as "hold- to -run " and
check if they work as the function indicated.
Every day
2
Max height limit switch
Push the UP button, inspect and ensure the lifting
platform stops rising at maximum lifting height.
Every day
Safe descent limit switch
Push the DOWN I button, inspect and ensure the lifting
platform stops descending at proper height above
ground.
Every day
3
Pneumatic filter
Listen and inspect the filter to ensure no leakage. Inspect
and ensure the water level is below its max limit mark and
the oil level is above the minimum limit mark.
Every day
4
Hydraulic block and valves
Inspect if the valves leak or not. Clean or change the valve
if any leakage.
Every day
5
Oil hoses and connectors
Inspect to ensure no leakage before using the lift.
Every day
6
Pneumatic hoses and connectors
Inspect to ensure no leakage before using the lift.
Every day