Check if both mechanical catches can engage and
disengage effectively and synchronously by pushing
control buttons.
Push DOWN II button to continue the lowering movement
when the lifting platforms automatically stop lowering at
safety height above the ground. Check if the buzzer
alarms.
Running the lift for several cycles with and without rated
load. The lift can run steadily and smoothly with no
abnormal noise.
Check the synchronization of both lifting platforms.
Ensure both platforms ascend and descend
synchronously.
Terminals in the control unit
Open the control unit, inspect the wire terminals and
screw firmly if any terminals become loose.
Add grease into the oil cups.
Check with torque spanner.
For M18 bolt, the torque is no less than 80N.m.
For M16, the torque is no less than 60N.m
Circlips of oil cylinder shaft
Inspect if any circlip goes off its groove. Make sure they
are positioned in the grooves.
Rolling wheels and their running
tracks
Push the UP and DOWN button to check if the wheel is
over-worn or cannot roll. Add grease to ensure smooth
running. Change over-worn wheels.
Check with torque spanner. The torque should be no less
than 330N.m.
Change the oil 6 months after initial use and once per
year thereafter. Inspect the hydraulic oil and change the
oil if the oil becomes black or there is dirt in the oil tank.
If users stick to the above maintenance requirements, the lift will always keep a good working condition
and its service life could be extended.