EasyManua.ls Logo

Eastron SDM630-Modbus V2 - Demand Integration Time Setup

Eastron SDM630-Modbus V2
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EASTRON SDM630-Modbus V2 User Manual
VoIPDistri.com - Voice over IP Distribution, Im Hagen 3, 33790 Halle Westfalen, Germany
Fon: +49 5201-73-00-30 | Fax: +49 5201-7829 | Mobil: +49 176 -204-2222-1
- 9 -
2-3
Repeat the procedure for the remaining
three digits
2-4
After setting the last digit, SET will show.
Press to exit the number setting routine and return to the Set-up menu. SET will be
removed
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: 0, 5, 8, 10, 15, 20, 30, 60 minutes
1
From the set-up menu, use and
buttons to select the DIT
option. The screen will show the
currently selected integration time.
2-1
Press to enter the selection
routine.
The current time interval will flash
2-2
Use and buttons to
select the time required.

Related product manuals