EasyManua.ls Logo

Eaton 9910-E15 - Page 12

Eaton 9910-E15
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
EATON 9130 (9910-E15/E16) UPS Installation Guide for IBM
®
Applications S 164201783 Rev 2
12
6. Verify that the EBM connections are tight and that adequate bend
radius and strain relief exist for each cable.
7. Continue to “Starting the UPS” on page 22.
Remove cable retention clip. Plug in EBM cable. Rotate clip. Reinstall cable retention clip.
Figure 3. Connecting the EBMs

Table of Contents

Related product manuals