EasyManua.ls Logo

Eaton 9910-E15 - Configuring for Extended Battery Modules

Eaton 9910-E15
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
EATON 9130 (9910-E15/E16) UPS Installation Guide for IBM
®
Applications S 164201783 Rev 2
24
Configuring the UPS for EBMs
To ensure maximum battery runtime, configure the UPS for the correct
number of EBMs:
1. Press any button on the front panel display to activate the menu
options, then select SETTINGS, USER SETTINGS, and NUMBER OF
BATTERY STRINGS.
2. Use the
or buttons to select the number of battery strings
according to your UPS configuration:
All UPS and EBM Cabinets
Number of Battery Strings
UPS only (internal batteries) 1 (default)
UPS + 1 EBM 3
UPS + 2 EBMs 5
UPS + 3 EBMs 7
UPS + 4 EBMs 9
NOTE If 0 is selected, no batteries are connected and all battery-related
alarms are disabled.
NOTE The UPS contains one battery string; each EBM contains two battery
strings.
3. Press the button to save the setting.
4. Press the
ESC
button until the start screen appears.

Table of Contents

Related product manuals