EasyManua.ls Logo

Eaton 9PX EBM 180V - Tower installation

Eaton 9PX EBM 180V
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 18
5-6kVA EU_EN
3. Installation
3.6 Tower installation
Adjustment of the orientation of the LCD panel and of the logo.
Adjustment of the angle of vision of the LCD panel.
If you ordered other UPS accessories, refer to specic user manuals to check the tower installation
with the UPS.
To install the cabinet:
1. Place the UPS on a at, stable surface in its nal location.
2. Always keep 150 mm of free space behind the UPS rear panel.
3. If installing additional cabinets, place them next to the UPS in their nal location.

Related product manuals