EasyManua.ls Logo

Eaton Power Xpert 9395 - Initial Startup; Completing the Installation Checklist; Figure 4-14. 1085 HR Battery String Connection

Eaton Power Xpert 9395
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Power Xpert 9395 Integrated Battery Cabinet (Model 1085 and 1085HR) Installation Manual S 164201687 Rev 4 www.eaton.com/powerquality
4-16
Battery Breaker
Fixed Battery Power
Connector (black)
String Connectors
(black with blue lock)
Figure 4‐14. 1085HR Battery String Connection
4.4 Initial Startup
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on page W-1 become void. This
service is offered as part of the sales contract for the UPS. Contact service in advance
(usually a two-week notice is required) to reserve a preferred startup date.
4.5 Completing the Installation Checklist
The final step in installing the battery cabinet is to complete the Installation Checklist.
This checklist ensures all hardware, cables, and other equipment have been installed.
Completing all items on the checklist will ensure a smooth installation. Make a copy
of the Installation Checklist before filling it out, and retain the original.
After completing your installation, a service representative will be able to verify the
operation of the battery cabinet and commission it to support the critical load. The
service representative cannot perform any installation tasks other than verifying that
the battery cabinet has been correctly installed. Service personnel may request a copy
of the completed Installation Checklist to be sure all applicable equipment installation
requirements have been completed.
NOTE The Installation Checklist MUST be completed prior to starting the battery system for the first time.

Table of Contents

Other manuals for Eaton Power Xpert 9395

Related product manuals