EasyManua.ls Logo

Ecolab GEOCENTER - GeoCenter Specifications and Requirements; GeoCenter Dimensions and Weight; GeoCenter Installation Access Requirements; GeoCenter Product Tubing Specifications

Ecolab GEOCENTER
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
6" MIN (US)
30 cm (INT'L)
WA
T
ER FLOW
H
D
W
3.0 SPECIFICATIONS
System Diagram


3.4 Electrical Requirements

source supplied through two 30 VA transformers. The
transformer primaries can be either 115 or 230 volts. One
transformer provides power for the detergent control and
the other provides power for the rinse injector.
If the primary voltage is 440 volts, two separate, externally
mounted transformers will be required. The 24 volt secondary
wiring of one transformer will be connected directly to the
Detergent Controller P.C. Board. The 24 volt secondary of the
second transformer will be connected directly to the Rinse
Speed Control P.C. Board. Both the internal transformers
can be removed when wiring for a 440 volt installation.
IMPORTANT: Make sure the power source is turned off
3.1 Dimensions
  
  
  
 
3.2 Access Requirements
Mounting location must allow cabinet cover to swing down

the right side to service the peristaltic pump, and on the left
for electrical service.
3.3 Product Pickup and Discharge
        
exceed 10' (3 meters) in length. The maximum discharge
tubing length of 150' (45 meters) will accommodate
remote installations of the GeoCenter. If tubing length
exceeds 50' (15 meters) the tubing must be replaced with

SOLENOID VALVE
(REFER TO FIGURE 4-4 ON
PAGE 6.)
DETERGENT CONTROLLER
P.C. BOARD
RINSE SPEED
CONTROL P.C. BOARD
TRANSFORMER ASSEMBLY
(REFER TO FIGURE 5-2 ON

INJECTION POINT
TO GEOSYSTEM
RINSE DISPENSER

S-2000
SENSOR

VISUAL FLOW INDICATOR


Table of Contents

Related product manuals