EasyManua.ls Logo

EDAN SE-601B - 4.3 Patient Preparation

EDAN SE-601B
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SE-601 Series Electrocardiograph Service Manual Inspection and Troubleshooting
- 39 -
Figure 5-12 UART Screen
5.3 Module Tests
When a module is suspected of malfunction, the verification methods are described in this
chapter.
5.3.1 Main Board Test
To verify the main board,
1) Open the main unit following the procedures described in Chapter 6, Electrocardiograph
Disassembly.
2) Switch on the device.
3) Measure the voltage to earth of the test points listed below by using a multimeter.
Item
Test point
Reference result
TP7
+8.3V±0.42V
TP8
+5V±0.25V
TP6
+12V±0.60V
TP5
+3.3V±0.16V
理邦保密文件
EDAN CONFIDENTIAL

Other manuals for EDAN SE-601B

Related product manuals