EasyManua.ls Logo

Effekta AX M2 Series - Page 41

Effekta AX M2 Series
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Control and display elements - Page 41
Solar
inverter
|
V1.7
27
Defining battery
bank, charge
retention voltage:
3KW Pre-setting: 27.0V
5KW Pre-setting: 54.0V
When "USE" is selected in menu point 05, the
charge retention voltage can be set here.
The setting range extends from 24.0 V to 32.0 V for
the 3-kW model and from 48.0 V to 64.0 V for the 5-
kW model. The increase per each click is 0.1V.
28
Setting the output
operation mode.
(This parameter
setting is only
available in STAND-BY
MODE for safety
reasons).
It is recommended to
use a maximum of 4
SWRs in parallel mode
and 3SWRs in three-
phase current
operation.
Single
If the device is operated
alone, please select "SIG" in
program 28.
Pa
ra
ll
el
When units are used in
parallel for single phase
applications, please select
"PAL" in program
28. Please refer to 5-1 for
detailed information.
L1
Phase
When the units are
operated in a 3-phase
application, please select
"3PX" to define each
inverter.
At least 3 inverters or a
maximum of 9 inverters are
required to support three-
phase devices. At least one
inverter in each phase or up
to four inverters in one
phase are
L2
Phase
L3
Phase

Table of Contents