EFT agriculture frame installation manual
© 2020 Hefei EFT all rights reserved
RTK installation
6. Install the RTK external antenna.
5. Pass the RTK antenna through the arm to the
upper end of the wire protection hole. A
straight antenna is required.
4. Install RTK adapter thread.
3. Install the RTK adapter and screw on the
M3*8 screws of the folding part.
2. Remove the M3*8 screws of the
folding parts.