Copyright 2005 by ELTRA GmbH Germany – January 2005 – Operation Manual ON-900
1 INSTALLATION
1.1 Setting up
Since the analyser weighs about 130 kg it should be placed on a suitably stable surface. The
balance should also be placed free of vibration.
The balance can be placed in any position, positioning it to the right of the analyser has
proved to be best suited.
The balance can of course also be placed on a weighing table next to the analyser.
There are no special requirements for setting up the printer and computer; they can be
placed on a normal desk.
Below is an example in installation:
Although the analyser's operating environment does not necessarily need to be air
conditioned, it is advisable to keep the room temperature between 18°C and 30°C.
Never run the water pump without any water or else it will be damaged!
The pump is activated when the mains switch is set to pos. 2.
First fill up the cooling system with water, according to chapters 2TU1.6U2T and 2TU1.7U0T2T.
Under no conditions should the device be placed in direct sunlight !
Avoid places exposed to the wind of air conditioners or to the wind blowing through
open windows or doors.
TARE
C FI / O F
TARE
sartor ius
C A L
0 20 30 40
50
60
70
80 seconds
10
10.0
9.0
8.0
7.0
6.0
4.0
3.0
5.0
2.0
1.0
0.0
-1.0
MAXDATA
Magic
02-1
0
2
1
ON 900
O xy g en Ni t r og e n D et e r mi n a to r
A
10
5
4
3
2
0
1
VO LT CRA FT