Copyright 2005 by ELTRA GmbH Germany – January 2005 – Operation Manual ON-900
0.2 Index
OPERATION MANUAL ON - 900
as from serial no. 1550xxxxxx
2TU1 INSTALLATIONU2T
2TU1.1 Setting upU2T
2TU1.2 Front panel illustrationU2T
2TU1.3 Mains power connectionsU2T
2TU1.4 Data interfacesU2T
2TU1.5 Gas connectionsU2T
2TU1.6 Cooling waterU2T
2TU1.7 Filling the cooling waterU2T
2TU1.8 Adjusting the gas flowU2T
2TU2 ANALYSISU2T
2TU2.1 Working procedureU2T
2TU2.2 Work breaksU2T
2TU2.3 Fractional analysisU2T
2TU2.4 ApplicationsU2T
2TU2.5 Gas conservationU2T
2TU3 MAINTENANCEU2T
2TU3.1 General informationU2T
2TU3.2 Installing and removing the reagent tubesU2T
2TU3.3 Filling the reagent tubesU2T
2TU3.4 Replacing the O-ringsU2T
2TU3.5 Cleaning the dust trapU2T
2TU3.6 Cleaning the furnaceU2T
2TU3.7 Replacing the electrodes
2TU4 DESCRIPTION OF FUNCTIONSU2T
2TU4.1 Measuring principleU2T
2TU4.2 Gas flow systemU2T
2TU4.3 Infrared cellU2T
2TU4.4 Thermoconductivity cellU2T
2TU5 MISCELLANEOUSU2T
2TU5.1 Ordering numbersU2T
2TU5.2 PackingU2T
2TU5.3 Trouble shootingU2T
2TU5.4 ON-900 Pre-installation guideU2T