Copyright 2005 by ELTRA GmbH Germany – January 2005 – Operation Manual ON-900
1.3 Mains power connections
Since the infrared cell requires about 1 hour to reach a stable operating temperature, it is
advisable to connect the analyser to the mains power first and switch on before further
installation work is carried out.
This waiting time is only necessary when installing the analyser. Since it is normally not
switched off, and is always in operating temperature.
1 Analyser
2 Computer
3 Monitor
4 Printer
5 Balance
6 Triple plug
7 Analyser mains plug
First connect the analyser to the mains power and switch it on. The switch, located on the
fore side of the analyser, is to be set to position 1.
2-2
3
4
2
5
7
1
7
6
Model : O N900
SerialNo.:
XXXXXXXXXX
VoltsAC:
Amps:30 max.
Watts:10000max.
IP20 1999
madein Germany
ELTRAGmbH
Mainstr.85 Block20 D-41469Neuss Germany
Phone:+(49)213712822 Fax:+(49)213712513
400+/-10%3Ph 50-60Hz
2-4 ba r (30- 60psi)
99,9% p ure
Heli um in let