EasyManua.ls Logo

ELTRA ON-900 User Manual

ELTRA ON-900
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
0.1
ELTRA GmbH
Retsch-Allee 1-5
42781 Haan Germany
www.eltra.org

Other manuals for ELTRA ON-900

Question and Answer IconNeed help?

Do you have a question about the ELTRA ON-900 and is the answer not in the manual?

ELTRA ON-900 Specifications

General IconGeneral
BrandELTRA
ModelON-900
CategoryMeasuring Instruments
LanguageEnglish

Summary

1 INSTALLATION

1.1 Setting up

Proper placement and environmental considerations for the analyser and balance.

1.2 Front panel illustration

Detailed diagram identifying components on the analyser's front panel.

1.3 Mains power connections

Instructions for connecting the analyser to the electrical power supply.

1.4 Data interfaces

Details on the rear panel connections for data transfer and communication.

1.5 Gas connections

Guidelines for connecting compressed air and carrier gas supplies.

1.6 Cooling water

Explanation of the two cooling water circulation systems.

1.7 Filling the cooling water

Step-by-step procedure for filling and bleeding the cooling system.

1.8 Adjusting the gas flow

Procedures for setting and adjusting gas flow rates for optimal analysis.

2 ANALYSIS

2.1 Working procedure

Detailed steps for performing analysis and understanding different operational modes.

2.2 Work breaks

Recommended procedures for handling work breaks and analyser standby.

2.3 Fractional analysis

Explains the concept and methods for separating different oxygen phases.

2.4 Applications

Lists specific applications and settings for analysing different materials.

2.5 Gas conservation

Describes the function for automatically reducing carrier gas consumption.

3 MAINTENANCE

3.1 General information

Overview of maintenance tasks and their recommended frequencies.

3.2 Installing and removing the reagent tubes

Instructions for safely installing and removing reagent tubes.

3.3 Filling the reagent tubes

Details on the chemicals and procedures for filling reagent tubes.

3.4 Replacing the O-rings

Guidelines for replacing O-rings on reagent tubes and furnace components.

3.5 Cleaning the dust trap

Procedure for cleaning or replacing the quartz wool in the dust trap.

3.6 Cleaning the furnace

Steps for cleaning the analyser furnace to ensure optimal performance.

3.7 Replacing the electrodes

Instructions for replacing worn graphite tips and upper electrodes.

4 DESCRIPTION OF FUNCTIONS

4.1 Measuring principle

Explanation of how the analyser measures oxygen and nitrogen in samples.

4.2 Gas flow system

Diagram illustrating the flow path of gases through the analyser system.

4.3 Infrared cell

Detailed description of the infrared cell's function and operation.

4.4 Thermoconductivity cell

Explanation of the thermoconductivity cell for nitrogen detection.

5 MISCELLANEOUS

5.1 Ordering numbers

Lists part numbers for various components of the analyser.

5.2 Packing

Instructions and guidelines for packing the analyser for transport.

5.3 Trouble shooting

Common problems and their solutions for the analyser.

5.4 ON-900 Pre-installation guide

Requirements and checks before installing the ON-900 analyser.

Related product manuals