EasyManua.ls Logo

Emerson Liebert GXT MT+LB 10KL - Installation and Operation

Emerson Liebert GXT MT+LB 10KL
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
2-4. Installation for hot standby
If the hot standby function is not used, you may skip this section.
1) Disconnect the jumper wire between the terminals of “BPS” and “L0” on the host UPS.
2) Keep the jumper wire between the terminals of “BPS” and “L0 on the standby UPS.
3) Connect the “L1” of the standby UPS to the “BPS” of the host UPS.
4) Connect the “Output N” of the standby UPS to the “Output N” of the host UPS.
BPS
L0
GND
BPS
L0
Standby UPS
Host UPS
Output
Input
NOTE: Each UPS must be connected to an independent battery pack.
2-5. Software Installation
For optimal computer system protection, install UPS monitoring software to fully configure UPS shutdown.

Related product manuals