EasyManua.ls Logo

Emerson SolaHD SDU AC B Series - 5.0 Installation Instructions; Installation Notices and Requirements; Comm Card and Location Setup

Emerson SolaHD SDU AC B Series
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page: 10
5.0 Installation Instructions
WARNING
To reduce risk of fire, connect only to a circuit provided with 20A maximum branch circuit
overcurrent protection in accordance with the National Electrical Code
®
(NEC
®
) and CEC.
Figure 5: Input/Output Terminals
INSTALLATION NOTICE
TO AVOID CRITICAL DAMAGE TO UPS:
•DO NOT BOND THE INPUT AND OUTPUT NEUTRALS TOGETHER.
•DO NOT CONNECT THE OUTPUT NEUTRAL TO GROUND
•Placement: InstalltheUPShorizontallyinaprotectedareawithadequateairflow:20mmaboveand
below the unit, 10mm in front of the unit� Do not operate the UPS outdoors� It is required that an input
breaker is added in front of the UPS�
•COMM CARD Installation: To install the optional card, remove the COMM PORT cover and insert the
card� Refer to the SDU COMM CARD Manual for more details� (Refer to inside cover for COMM CARD
options or contact your SolaHD representative)�
•DIN Rail Mounting: Follow instructions below
Location
Installthepowermoduleandbatterymoduleinaprotectedareawithadequateairflowandfreeofexcessive
dust� Do not operate the UPS outdoors�

Related product manuals