EasyManua.ls Logo

Endress+Hauser Flowmeter Proline 200 - Electrical Connection; Connection Conditions & Cables

Endress+Hauser Flowmeter Proline 200
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Flowmeter Proline 200 Electrical connection
Endress+Hauser 13
5 Electrical connection
5.1 Connection conditions
5.1.1 Required tools
For cable entries: Use corresponding tools
For securing clamp: Allen key 3 mm
Wire stripper
When using stranded cables: Crimper for wire end ferrule
For removing cables from terminal: Flat blade screwdriver ≤ 3 mm (0.12 in)
5.1.2 Connecting cable requirements
The connecting cables provided by the customer must fulfill the following requirements.
Electrical safety
In accordance with applicable federal/national regulations.
Permitted temperature range
The installation guidelines that apply in the country of installation must be observed.
The cables must be suitable for the minimum and maximum temperatures to be expected.
Signal cable
Pulse/frequency/switch output
Standard installation cable is sufficient.
FOUNDATION Fieldbus
Twisted, shielded two-wire cable.
For further information on planning and installing FOUNDATION Fieldbus networks see:
Operating Instructions for "FOUNDATION Fieldbus Overview" (BA00013S)
FOUNDATION Fieldbus Guideline
IEC 61158-2 (MBP)
Cable diameter
Cable glands supplied:
M20 × 1.5 with cable  6 to 12 mm (0.24 to 0.47 in)
Plug-in spring terminals for device version without integrated overvoltage protection: wire
cross-sections 0.5 to 2.5 mm
2
(20 to 14 AWG)
Screw terminals for device version with integrated overvoltage protection: wire cross-
sections 0.2 to 2.5 mm
2
(24 to 14 AWG)

Related product manuals