Flowmeter Proline 200 Electrical connection
Endress+Hauser 13
5 Electrical connection
5.1 Connection conditions
5.1.1 Required tools
• For cable entries: Use corresponding tools
• For securing clamp: Allen key 3 mm
• Wire stripper
• When using stranded cables: Crimper for wire end ferrule
• For removing cables from terminal: Flat blade screwdriver ≤ 3 mm (0.12 in)
5.1.2 Connecting cable requirements
The connecting cables provided by the customer must fulfill the following requirements.
Electrical safety
In accordance with applicable federal/national regulations.
Permitted temperature range
• The installation guidelines that apply in the country of installation must be observed.
• The cables must be suitable for the minimum and maximum temperatures to be expected.
Signal cable
Pulse/frequency/switch output
Standard installation cable is sufficient.
FOUNDATION Fieldbus
Twisted, shielded two-wire cable.
For further information on planning and installing FOUNDATION Fieldbus networks see:
• Operating Instructions for "FOUNDATION Fieldbus Overview" (BA00013S)
• FOUNDATION Fieldbus Guideline
• IEC 61158-2 (MBP)
Cable diameter
• Cable glands supplied:
M20 × 1.5 with cable  6 to 12 mm (0.24 to 0.47 in)
• Plug-in spring terminals for device version without integrated overvoltage protection: wire
cross-sections 0.5 to 2.5 mm
2
(20 to 14 AWG)
• Screw terminals for device version with integrated overvoltage protection: wire cross-
sections 0.2 to 2.5 mm
2
(24 to 14 AWG)