EasyManua.ls Logo

enphase IQ Battery 3T User Manual

enphase IQ Battery 3T
9 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
QUICK INSTALL GUIDE (Models Encharge-3T-1P-NA and Encharge-10T-1P-NA)
Install the Enphase IQ Battery System
To install the Enphase
IQ Battery 3T system or IQ Battery 10T system and the Enphase wall-mount bracket, read and follow all warnings and instructions in
this guide. Safety warnings are listed on the back of this guide. These instructions are not meant to be a complete explanation of how to design and install an
energy storage system. All installations must comply with national and local electrical codes and standards. Only qualied electricians shall install, trouble-
shoot, or replace the IQ Battery 3T or IQ Battery 10T.
The IQ Battery system includes the Enphase IQ Battery(ies) with integrated Enphase IQMicroinverters. The Enphase IQ Gateway measures PV produc-
tion and home energy consumption. The IQ Battery system senses when it is optimal to charge or discharge the battery so that energy is stored when it is
abundant and used when scarce. IQ Battery systems are capable of providing backup power when an Enphase IQ System Controller is installed at the site.
Five unique installation
scenarios are shown:
Whole home backup with IQ System
Controller as service entrance and
PV combiner connected to IQ System
Controller. This is the preferred
conguration for back up of the entire main
load panel. This conguration supports up
to an 80A breaker for the PV circuit and an
80A breaker for battery storage.
Whole home backup with IQ System
Controller as service entrance and PV
combiner connected to main load panel.
This is the preferred conguration when you
back up the entire main load panel, and the
size of the PV combiner circuit is more than
80A. In this conguration, the PV combiner
circuit connection space in IQ System
Controller is left vacant. When existing PV
combiner circuits are connected to the main
load panel, and you want to add battery
storage to the system, you can keep the PV
combiner connected to the main load panel
and connect only the battery storage to IQ
System Controller.
Partial home backup with main load panel
as service entrance and PV combiner
connected to IQ System Controller. When
PV circuits breaker size is less than 80A,
this is the preferred conguration for partial
home backup with subpanel.
© 2021 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ Battery, IQ Gateway, IQ combiner, IQ microinverter, Enphase App and other trademarks
or service names are trademarks of Enphase Energy, Inc. Data subject to change. Rev06- 10-23-2021
NOTE:
1. For M215/M250 connection to Enphase
Energy System, refer tech brief at https://
enphase.com/en-us/storage-m-series
2. M series microinverters require Gateway-S
metered.
(optional)
(optional)
(optional)
Question and Answer IconNeed help?

Do you have a question about the enphase IQ Battery 3T and is the answer not in the manual?

enphase IQ Battery 3T Specifications

General IconGeneral
Nominal Voltage48 V
Maximum Continuous Output Power1.28 kW
Round Trip Efficiency96%
Nominal Energy Capacity3.5 kWh
Usable Energy Capacity3.36 kWh
Continuous Power Output1.28 kW
Warranty10 years
Operating Temperature Range-4°F to 122°F (-20°C to 50°C)

Summary

Preparation

Installation

Plan Installation Location

Guidelines for selecting a suitable, well-ventilated location for IQ Batteries, considering clearances and access.

Install AC Disconnect

Instructions for installing an AC disconnect, ensuring accessibility and compliance with standards for safe operation.

Prepare Wall-Mount Bracket Installation

Steps for preparing the wall for bracket mounting, including clearance checks and marking the installation position.

Install IQ Battery Wall Mount Bracket

Procedures for securely attaching single-width (IQ Battery 3T) or triple-width (IQ Battery 10T) wall mount brackets.

Mount IQ Batteries on Wall

Detailed steps for safely lifting and mounting IQ Battery units onto the prepared wall brackets, requiring two people.

Prepare for Field Wiring

Steps to prepare for electrical connections, including securing conduits and ensuring the DC switch is off.

Install Conduit and Field Wiring

Guidance on connecting field wiring to IQ Batteries, including conductor sizing, terminal connections, and safety precautions.

Cover and Energize System

Instructions for closing the battery covers, ensuring proper wire management, and safely energizing the system.

Configure and Activate

Commissioning and LED Overview

Steps to commission IQ Batteries using the Enphase App and understanding the LED indicators for system status.

Operating Modes and Set Points

How to select battery operating modes (Self-consumption, Savings, Full backup) via the Enphase App.

Troubleshooting IQ Battery Issues

Guidance on diagnosing and resolving common operational problems with IQ Batteries, including LED indicators and connectivity.

Safety

Emergency Procedures

Safety instructions for fire, flooding, and other emergencies, including evacuation and extinguisher use.

Safety and Advisory Symbols

Explanation of DANGER, WARNING, and NOTE symbols used throughout the manual for hazard identification.

General Safety Instructions

Critical safety guidelines for electricians regarding electric shock, fire, explosion risks, and proper handling.

Environmental Protection and Disposal

Guidelines for the proper disposal of electronic devices and batteries, emphasizing environmental responsibility.

Related product manuals