Section 2 Gettin
started 18
Section 13 Programming: edit program 0 to set up a basic weld sequence e.g. Squeeze =
200, Main heat = 100, Hold = 200, Pulses=1, and Main mode = P/W. A welding operation
should be possible at this stage. Begin by using the gun short-circuit. The iPAK2 should report
the measured current on the diagnostic display.
Section 7 Electrode management: perform the current and CCC calibration procedures.
Make any other adjustments which may be required and set up other programmes for welding.