EasyManua.ls Logo

Envirovent MEV 160 - Installation Preparation; Box Contents; Pre-Installation Checklist

Envirovent MEV 160
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
AFTER INSTALLING THIS UNIT,
PLEASE PASS ONTO END USER
DO NOT THROW AWAY
BOX CONTENTS
Item Description Quantity
MEV 160 or 300 unit 1
Instruction Guide 1
Wireless Remote Control
(Remote Control units only)
1
Wired Boost Switch
(standard units only)
1
Spigot packs
(125mm duct or 75/90mm fast track)
3
Screws
(8g x 2.0”)
4
Wall plugs 4
Foam pads 4
Rubber bushings 4
M5 Washers 4
PRE-INSTALLATION CHECKLIST
Does the unit and ductwork fit in the space where it will be installed?
Is there room to connect ducts to the spigots without tight duct bends?
Are all obstructions cleared in the locations where the extract valves will be fitted?
Is the mounting surface strong enough to support the unit?
Is the mounting surface level?

Related product manuals