High voltage is correct and matches nameplate.
•
Fuses, breakers and wire size correct.
•
Low voltage wiring complete.
•
Pipingcompletedandwatersystemcleanedandushed.
•
Air is purged from closed loop system.
•
Isolation valves are open, water control valves or loop pumps wired.
•
Condensate line open and correctly pitched.
•
Transformerswitchedto208Vifapplicable.
•
Black/whiteandgray/whitewiresinunitcontrolboxhavebeenremovedifauxiliaryheathasbeeninstalled.
•
Dip switches are set correctly.
•
DHW pump switch is “OFF” unless piping is completed and air has been purged.
•
Blower rotates freely – foam shipping support has been removed.
•
Blower speed correct (dip switch is set correctly).
•
Airlter/cleaneriscleanandinposition.
•
Service/accesspanelsareinplace.
•
Returnairtemperatureisbetween50-80ºFheatingand60-95ºFcooling.
•
Check air coil cleanliness to insure optimum performance. Clean as needed according to maintenance guidelines.
•
Toobtainmaximumperformancetheaircoilshouldbecleanedbeforestartup.A10-percentsolutionofdishwasher
detergent and water is recommended for both sides of coil, a thorough water rinse should follow.
1. Initiateacontrolsignaltoenergizetheblowermotor.Checkbloweroperation.
2. Initiateacontrolsignaltoplacetheunitinthecoolingmode.Coolingsetpointmustbesetbelowroomtemperature.
3. First stage cooling will energize after a time delay.
4. Besurethatthecompressorandwatercontrolvalveorlooppump(s)areactivated.
5. VerifythatthewaterowrateiscorrectbymeasuringthepressuredropthroughtheheatexchangerusingtheP/T
plugsandcomparingtounitcapacitydatainspecicationcatalog.
6. Checkthetemperatureofboththesupplyanddischargewater(seepages35-36).
7. Checkforanairtemperaturedropof15°Fto25°Facrosstheaircoil,dependingonthefanspeedandenteringwater
temperature.
8. Decreasethecoolingsetpointseveraldegreesandverifyhigh-speedbloweroperation.
9. Adjustthecoolingsetpointabovetheroomtemperatureandverifythatthecompressorandwatervalveorlooppumps
deactivate.
10.Initiateacontrolsignaltoplacetheunitintheheatingmode.Heatingsetpointmustbesetaboveroomtemperature.
11. Firststageheatingwillenergizeafteratimedelay.
12. Checkthetemperatureofboththesupplyanddischargewater(seepages35-36).
13. Checkforanairtemperatureriseof20°Fto35°Facrosstheaircoil,dependingonthefanspeedandenteringwater
temperature.
14. Ifauxiliaryelectricheatersareinstalled,increasetheheatingsetpointuntiltheelectricheatbanksaresequencedon.
All stages of the auxiliary heater should be sequenced on when the thermostat is in the Emergency Heat mode.
Check amperage of each element.
15. Adjusttheheatingsetpointbelowroomtemperatureandverifythatthecompressorandwatervalveorlooppumps
deactivate.
16. Duringalltesting,checkforexcessivevibration,noiseorwaterleaks.Correctorrepairasrequired.
17. Setsystemtodesirednormaloperatingmodeandsettemperaturetomaintaindesiredcomfortlevel.
18. Instructtheowner/operatorintheproperoperationofthethermostatandsystemmaintenance.
Note:CompletetheEquipmentStart-Up/CommissioningCheckSheetduringthisprocedure.Refertothermostatoperatinginstructionsand
complete the startup procedure.
Startup Steps
Note:Becertaintolloutandforwardallwarrantyregistrationpapers.
Unit Startup
Before Powering Unit, Check The Following:
Note: Remove and discard the two compressor hold down shipping bolts located at the front and rear of the compressor mounting bracket. The bolts
can then be discarded.