EasyManua.ls Logo

Envision R-410A - Preventive Maintenance; Replacement Procedures

Envision R-410A
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
ENVISION RESIDENTIAL INSTALLATION MANUAL
Preventive Maintenance
Water Coil Maintenance
1.Keepallairoutofthewater.Anopenloopsystemshouldbecheckedtoensurethatthewellheadisnotallowingairto
inltratethewaterline.Linesshouldalwaysbeairtight.
2.Keepthesystemunderpressureatalltimes.Itisrecommendedinopenloopsystemsthatthewatercontrolvalvebe
placed in the discharge line to prevent loss of pressure during off cycles. Closed loop systems must have positive static
pressure.
Note:Onopenloopsystems,iftheinstallationisinanareawithaknownhighmineralcontent(125PPMorgreater)inthe
water, it is best to establish with the owner a periodic maintenance schedule so the coil can be checked regularly. Should
periodic coil cleaning be necessary, use standard coil cleaning procedures which are compatible with either the cupronickel
orcopperwaterlines.Generally,themorewaterowingthroughtheunitthelesschanceforscaling.
Other Maintenance
Filters
Filters must be clean to obtain maximum performance. They should be inspected monthly under normal operating condi-
tionsandbereplacedwhennecessary.Unitsshouldneverbeoperatedwithoutalter.
Condensate Drain
In areas where airborne bacteria produce a slime in the drain pan, it may be necessary to treat chemically to minimize
theproblem.Thecondensatedraincanpickuplintanddirt,especiallywithdirtylters.Inspecttwiceayeartoavoidthe
possibilityofoverow.
Blower Motors
ECM blower motors are equipped with sealed ball bearings and require no periodic oiling.
PSC blower motors should only be lubricated if dry operation is suspected.
Desuperheater Coil
See Water Coil Maintenance section above.
Air Coil
The air coil must be cleaned to obtain maximum performance. Check once a year under normal operating conditions
and,ifdirty,brushorvacuum(withabrushattachment)clean.Caremustbetakennottodamagethealuminumnswhile
cleaning.
Replacement Procedures
Obtaining Parts
When ordering service or replacement parts, refer to the model number and serial number of the unit as stamped on the
serial plate attached to the unit. If replacement parts are required, mention the date of installation of the unit and the date of
failure, along with an explanation of the malfunctions and a description of the replacement parts required.
In-Warranty Material Return
Material may not be returned except by permission of authorized warranty personnel. Contact your local distributor for
warranty return authorization and assistance.
CAUTION: Fin edges are sharp.

Other manuals for Envision R-410A