EasyManua.ls Logo

EOS E-Cool Wall B - Maintenance; Maintenance Interval; Maintenance Work; Dismantle Covers

EOS E-Cool Wall B
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
EN
Maintenance
Maintenance involves the following tasks:
Lubricate the ball bearing
Rell the disinfectant or replace the tank.
Descale the water circuit.De-scale the water
circuit.
Lubricate the ball bearings.
Cut the cable ties.
Lift the foam cover o.
Grease the ball bearings.
Place the foam cover on top and ax with a
cable tie.
Foam cover
Caution!
Risk of injury from electrical voltage.
Always disconnect the machine from the
power supply before carrying out any
maintenance.
Maintenance work
Fig. 11
Remove the covers
Servicing requires the hood to be open.
Remove the mains plug.
Lift the hood o the housing.
Abb.10
Maintenance interval
The ake ice machine must be serviced every
six months.
The cooling system for ice production is
a closed system with 0,36 kg R134a gas.
Normally, no rell is necessary.

Table of Contents