EasyManuals Logo

Epson RC180 Safety And Installation

Epson RC180
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #104 background imageLoading...
Page #104 background image
5. General Maintenance
RC180 Safety and Installation Rev.18
90
5.2 Inspection Point
Inspection While the Power is OFF (Manipulator is not operating)
M
anipulator
Inspection Point Inspection Place Daily Monthly Quarterly Biannual Annual
End effector
mounting bolts
Manipulator
mounting bolts
Each arm locking
bolts
Bolts/screws around
shaft
Check looseness or
backlash of
bolts/screws.
Tighten them if
necessary.
(For the tightening
torque, refer to
Tightening Hexagon
Socket Head Cap
Bolts.)
Bolts/screws
securing motors,
reduction gear units,
etc.
External connectors
on Manipulator (on
the connector plates
etc.)
Check looseness of
connectors.
If the connectors are
loosen, push it
securely or tighten.
Manipulator cable
unit
External appearance
of Manipulator
Visually check for
external defects.
Clean up if necessary.
External cables
Check for bends or
improper location.
Repair or place it
properly if necessary.
Safeguard etc.
Check tension of
timing belts.
Tighten it if
necessary.
Inside of Arm #2:
G1 G3 G6 G10 G20
LS RS
Inside of Base and
Arm #1, 2, 3, 4 :
C3
Grease conditions Refer to Greasing.
Battery - Replace every year

Other manuals for Epson RC180

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Epson RC180 and is the answer not in the manual?

Epson RC180 Specifications

General IconGeneral
BrandEpson
ModelRC180
CategoryController
LanguageEnglish

Related product manuals