EasyManua.ls Logo

Epson Stylus OFFICE B30 - Page 87

Epson Stylus OFFICE B30
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPSON Stylus C110/C120/D120/WorkForce 30/EPSON Stylus OFFICE B30/T30/T33/ME OFFICE 70 Revision C
DISASSEMBLY/ASSEMBLY Disassembling Printer Mechanism 87
Confidential
3. Move the CR Unit to left side of the printer.
4. Remove the screw (x1) that secures the LD Shaft Holder.
5. Move the LD Shaft Holder in the direction of the arrow while holding down its tab
with a flathead precision screwdriver, and remove the LD Shaft Holder.
Figure 4-57. Removing LD Shaft Holder
6. Remove the Extension Springs 10.99 (x3) from each hook of the Main Frame and
the Upper Paper Guide.
Figure 4-58. Removing Upper Paper Guide (1)
7. Remove the screws (x6) that secure the Main Frame, and remove it while avoiding
the LD Roller Shaft so as not to hit the Upper Paper Guide.
Figure 4-60. Removing Main Frame Assy.
LD Shaft Holder
Tab
C.B.P. 3x6, F/Zn-3C (6±1kgfcm)
Extension Spring 10.99Main Frame
C A U T I O N
When laying the Main Frame Assy, make sure to put it as shown in the
figure below. Do not lay it with the rollers of the Upper Paper Guide
facing downward, or the rollers or the nozzle surface may get damaged.
Figure 4-59. Precaution on Handling Main Frame Assy.
4
LD Roller Shaft
3
2
5
C.B.S. 3x6, F/Zn-3C (8±1kgfcm)
Holding Position
C.B.P. 3x8, F/Zn-3C (6±1kgfcm)
Main Frame Assy.
1
6

Table of Contents

Related product manuals