EPSON Stylus C110/C120/D120/WorkForce 30/EPSON Stylus OFFICE B30/T30/T33/ME OFFICE 70 Revision C
DISASSEMBLY/ASSEMBLY Disassembling Printer Mechanism 88
Confidential
When installing the Main Frame Assy, pay attention to the
following instructions.
1. Put the right part of the Upper Paper Guide indicated in
the figure below under the LD Roller Shaft.
2. Align the hook (x1) of the Frame Support with the positioning
hole (x1) of the Main Frame.
3. Align the hook (x1) of the ASF Unit with the positioning hole
(x1) of the Main Frame.
4. Align the guide pins (x2) of the Base Frame with the
positioning holes (x2) of the Main Frame.
Figure 4-61. Installing Main Frame Assy.
LD Roller Shaft
Upper Paper Guide
1
Tighten the screws in the order given in Figure 4-60.
Follow the steps below to install the Extension Spring 10.99 to
the Upper Paper Guide.
1. Attach the one end of the Extension Spring 10.99 to the
hook of the Upper Paper Guide.
2. Attach the another end of the Extension Spring 10.99 to the
hook of the Main Frame with a longnose plier.
Figure 4-62. Installing Extension Spring 10.99
Be sure to install the Grounding Spring referring to Figure
4-49 and Figure 4-52.
A D J U S T M E N T
R E Q U I R E D
After replacing the Main Frame, be sure to perform the
specified adjustment. See
Chapter 5 “ ADJUSTMENT” (p.98)
After replacing the Main Frame, be sure to perform the
specified lubrication. See
Chapter 6 “ MAINTENANCE”
(p.107)
Extension Spring 10.99
Hook