Configure and Test Hoist Operation 30
Examine the System
Once the installation procedure is complete, take some time to verify that all of the proper steps
have been completed.
Inspect all cable terminations (lift lines) to make sure they are sufficient.
Inspect all lift lines to ensure they are plumb and in the right location.
Inspect all lift lines to ensure there are no twists.
Ensure that all of the SafeStop devices are open.
Work all slack out of any lift lines. Reinspect the FlyPipe to make sure it is level.
Remove loose tools, hardware, debris, and any other obstructions from the hoist,
distribution raceway, if applicable, and the immediate area around the system.