Run and Verify Hoist Electrics and Data
12
Run Power and Data 12
Emergency Stop Termination 13
Verify Proper Wiring 14
Verify Hoist Is Not On Overtravel Limit
14
Verify Hoist Motor Orientation
14
Terminate Lift Lines to the Drum
15
Step 1:Verify the Drum is At Top Dead Center 15
Step 2: Thread Lift Lines Through SafeStop and Drum 15
Step 3: Attach Stop Sleeves to Lift Lines 16
Step 4: Finalize Lift Line Termination 17
Finalize Hoist and Cable Management Installation
18
Attach the Platter to the Hoist 19
Attach Cable Assembly to Platter 20
Ensure SafeStop Devices are Open 21
Float the Hoist 22
Level the Hoist and Test Movement 22
Test Hoist Movement
22
Install Slack Line Sensor Kit 22
Adjust Timing of the Hoist 23
Test and Adjust
24
Adjust SafeStop Device Position for Fleet Angle 24
Configure and Test Hoist Operation
26
Verify Hoist Function 26
Travel Limits 27
Set and Test your Limits 28
ii Prodigy FlyPipe Installation Guide