EasyManua.ls Logo

ETS SolarForce 652V - Page 26

ETS SolarForce 652V
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25809-02A
24 - Assembly Procedures
Parts needed:
Blowers (box 6)
(4) 1/4-20 x 5/8” Phillips pan head bolts
The Blower assemblies hook on
the base and pivot into position
(see detail below). Secure them
in place with the bolts.
Plug the cables from the
booth into each Blower.

Related product manuals