EasyManua.ls Logo

FAAC E124 - Motor, Lock, and Accessory Connections

FAAC E124
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
ENGLISH
Display Advanced Function
cF
0124365
AS
MAINTENANCE REQUEST - CYCLE COUNTER (linked to the subse-
quent two functions
):
You can enable the signaling of maintenance request, or the cycle counter.
Y = enable the SIGNALING when the program-
med number of cycles has been reached (as de-
fined in subsequent two functions
nc and nd).
Signaling consists of a pre-flashing of 8 sec (in addition to the time
may already be set with the function
PF) before each movement.
no = enable the CYCLE COUNTER, that will be displayed in the subse-
quent two functions
nc and nd up to a displayed maximum of
65,530.
If the number of cycles performed is greater than 65,530 the
subsequent two functions
nc and nd will display 65 and
53, respectively.
no no no no
nc
CYCLE PROGRAMMING (THOUSANDS):
If
AS = Y the display will show the number of thousands of cycles after
which the signaling of maintenance request begins (can be set from
0 to
99).
If
AS = no the display will show the number of thousands of work cycles
performed. The value displayed is updated with the succession of the
cycles, interacting with the value in
nd.
When AS = no you can reset the cycle counter: press
simultaneously
+
and
-
for 5 sec.
00 00 00 00
nd
CYCLE PROGRAMMING (TENS):
If
AS = Y the display will show the number of tens of cycles after which
the signaling of maintenace request begins (can be set from
0 to 99).
If
AS = no the display will show the number of tens of work cycles
performed. The value displayed is updated with the succession
of the cycles, interacting with the value in
nc.
e.g.: if the system has performed 11,218 cycles,
nc = 11 and nd = 21 will be displayed
00 00 00 00

Other manuals for FAAC E124

Related product manuals