25
Battery Pack / Bank Installation
SSG1.5KRM Models
Warning: Do not touch battery terminals located on the rear of the battery pack.
Warning: Verify the battery fuse is not installed prior to installing battery pack.
Note: The SSG1.5KRM UPS may be shipped with the battery pack preinstalled.
1. Verify the battery fuse is not installed.
2. Remove the plastic front panel and battery support plate as shown.
3. Install the battery pack with terminal side facing down to allow alignment with the mating battery
terminals inside the UPS battery compartment. Secure panel and support plate.