EasyManua.ls Logo

FENDT 920 Vario - 19. Three-point link

FENDT 920 Vario
267 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
85
OPERATION
18.8 Implement socket
Operation_Pic_number:1
From the implement socket (C) speed signals
are passed to the controlling devices, e.g.
sprayers, fertiliser spreaders.
Top view of implement socket
Operation_Pic_number:1
Designations are embossed.
1 = Radar signal - if equipped
2 = Transmission signal
3 = PTO shaft speed
4 = Fast lift switch
5 = Not in use
6 = +Battery voltage (+Ub)
7 = Ground
Fig.184
Fig.185
19. Three-point link
19.1 Lower links
Operation_Pic_number:1
Category II = 825 mm, III = 965 mm distance
between the lift support points (A).
NOTE:
Check ball/hook and bolts on the implement
side for wear and lubricate well.
Adjusting the lower control link di-
stance
Operation_Pic_number:1
Setting range: Category II - III.
DANGER:
Stay clear of the three-point link
when in operation - risk of crushing
or severing.
DANGER:
For lower link hook locking (see
OPERATION Fig. 189) never operate
or transport an implement unless
both hooks are securely locked.
Fig.186
Fig.187

Table of Contents

Related product manuals